Electric Lift Control Room Console for Natural Gas Plant – Winsted Ascend

Ascend The Williams Companies needed an expanded and updated control room for a remote energy facility in eastern Wyoming. We welcome projects that take us places far from major airports and immediately began the process of exchanging information. We revised our design repeatedly until our client was satisfied that all requirements were met, including best use of limited space and optimum ergonomics.

For this project, we used an electric lift Winsted Ascend Console with Chief articulating monitor arms, and a custom, built from scratch, heavy-gauge steel supervisor desk. We configured the desk to hold items of a client-specific size and hid heavy-duty casters behind a steel skirt.

Our team of three flew into Casper, Wyoming, a ninety-minute drive from the job site, and completed the installation in two days. After completing our work, high winds from an approaching snowstorm made loading and hauling away our pallets, used crates, cardboard, and plastic a challenge. Our flight home lifted off just as the snowstorm began – 14” by morning.

Our guarantee is very simple: Products and installation must meet or exceed customer expectations.